"Eat it up,
Wear it out,
Make it do,
Or go without."
~A Pioneer Sampler, by Barbara Greenwood~

Pioneer Woman at Heart

One Flourishing, Frugal and Fun Family!

One family learning to live off the land, cut back on expenses, and to live a simpler and a more self-sufficient lifestyle.

Saturday, February 24, 2024

Kitchen ~ Pattern Binder Purge

 


Friday was an extremely foggy day.  I was a bit worried about my husband's drive to work. By 11am, the fog had lifted.


My husband and I were not happy with the glue-down flooring that was installed in the kitchen, after half of the floor was torn out for joist replacements and new subfloor over a year ago.  it was coming up, spreading apart and dirt was sticking in the cracks.

A wrench in my winter hallway repairs, but the flooring was on sale, and the installers were free, so my husband made arrangements.

On Wednesday, we emptied the entire kitchen, other than the refrigerator.  The flooring/installers were to arrive at 10-11am Thursday to install (same flooring as hallway).  Around noon, I am notified that they are not going to make it.  Friday they arrived, but had to come back on Saturday to finish up.  Hence my delay on posting.



During my waiting process, I had collected all of the pattern binders (but one), purged them all, tossed out what was junk, and gave away a pile of unwanted patterns.   Whew!  Project binder purge is DONE!  Checked off the to-do list! 

In the process of re-flooring the kitchen, we removed the only base board electrical heater and a new electrical outlet was installed.  We do not need the heater, and it was malfunctioning anyway (a hazard if left installed). 

New floor trim was installed where the heater was, and I had to paint a bit, but it all looks great.

I would say 90% of the hallway, and kitchen floor trim was re-installed. I painted the kitchen trim, so that saved us money, but we needed trim for the hallway.

Also, the computer chair, at our kitchen desk area had to be replaced.  I was not prepared for that expense.

Friday, February 23, 2024

Repairs/Renovations Progress ~ Winter Projects



Here is an update on our progress on our winter project list.  We've made some headway with the hallway, and a small repair in the master bedroom.

If you have followed my blog, you know that we started the hallway repairs/renovations 3 years ago.  

Life happens.  There were appointments, losing people we love, taking advantage of a time where someone could rip out our carpet for us (changing plans), and so forth.  I'm just glad I we got back on track.

The hallway has two steps in two locations, longer than normal, wider and the lowest part has a high ceiling.  It's on a cement slab as well.

It is so wide, we had several bookshelves in there, to accommodate books for the kids and myself.  When the local town library closed, I brought home a ton of books that were educational, and good for school needs.

Since then, the bookshelves were emptied, books donated, and bookshelves taken out.

(January 2021)

It all started with ripping out the carpet and getting new flooring.  The dogs and cats, and constant foot traffic wore the carpet out.  Well, that flooring (that first replaced the carpet) is being changed due to the fact we had to rip out all of the half wall paneling, so nothing matches color-wise.

 


We have been looking at flooring at every hardware store in the area, for the hallway (and kitchen). 



These 3 photos were taken in different light/location in the hall.  You can see that the original paint looks different in each one.  It is why it took us so long to pick out a paint color.

We decided on our paint color, but in complete shock on the price.  A gallon went up almost $14.00!   A whopping, almost $68.98!  I had to laugh when I friend said I was "overthinking" on the process of picking a color.


(This is the flooring we picked out {earlier photo prior to painting})





The hallway walls are now painted, other than the repaired drywall areas.  The color depends on the light coming in at the moment, but it is a farmhouse gray, and we love it!



The new flooring was picked up and installed.  It's very close to the color of the remainder of the house, but we did have to go with sheet vinyl flooring for this project.  Older houses do not have exactly flat flooring, ha ha!  Nothing is square either.  Either way, it saved us money, and it looks great!  I'll most likely be looking for a few runner rugs soon.

What's left to do?  Mud the repaired drywall areas one more time (done), sand and paint them.  Once that is done, we need to install floor trim.   We need to do some work for the two steps in the hallway as well.  Personally, once that is done, I may look into motion sensor strip lights for both steps, so we can see them more easily at night.

 We also need to paint the interior door to the garage and re-install door trim, and prime and paint the entry door.  Oh, and install the other light fixture.

We went to pick up the other light fixture, and they did not get them in as they said they would.  I will have to order it online.  No stores in the area had any in stock.  Well, there is a store within a 1 hour drive, that has them in stock, but we just don't have that kind of time right now.




Out with the old, and in with the new!  I've had this new switch plate since 2021.  They are USA made.  I can't believe I found where I had stored it all these years, but it's replacing the old one.  The old one is being donated.

Speaking of windows, I finally removed 15 year old scotch tape on the outside of the door window.  The kids, over the years, taped birthday (or other party) signs to the outside, and the residue was left.  It has been cleaned off completely now.


One of the electrical outlets in the master bedroom has been installed.  One more needs replaced, but that is part of an entirely different repair job that we'll tackle later.